Fernhill Cave
|

The day before the start of work
|

The site of the buried bedding-plane
|

The start of digging
(05Apr-08) |

Checking old photographs |

Uncovering the bedding-plane |

Fish and Chips |

Excavating a pit to reach the
bedding-plane |

Installing the pipes |

Excavation backfilled |

A general view of the spoil heap |

Rich, Katie, Hannah, Dave and Alan by the
shaft
(16-Apr-08)
|

The MK I Fernhill Truck |

Sunlight in the shaft 12:44 GMT,
19-May-08 |

Collapse 29-May-08 |

Collapse 29-May-08 |

The ACME Miracle drill jig |

The drilling jig in position
(01-Jul-08) |

Acupuncture to cure the collapse
(14-Jul-08) |

The Bald Truth! Clive, Rich and Duncan
|

Tony, adjusting a prop.
(16-Jul-08) |

Tony, installing lagging.
(16-Jul-08) |

Rich, wall building in the recovered
section.
(21-Jul-08) |

Lunch at the shaft. Alan, Rich, Clive and
Jrat
(21-Jul-08) |
 |
 |

Steel pins with lagging above. Alan at the
base of the rings.
(06-Aug-08) |
Fairy Cave Quarry
Flooding Wednesday 9th July 2008 - photographs by
Alan Gray
|

The entrance to Withyhill Cave |

Lake at the SW corner of the quarry
|

Lake at the SW corner of the quarry
|

The Withybrook stream |

The intrepid few: Mandy & Matt, Geoff,
Duncan and Dave. |